Landing banner

2016 Safety Indicators

 

            2016  

2015

2014

2013

2012

Fatal accidents

               0

0

0

2

4

Accidents leading to an absence of one day or more

              47

42*

76*

49

81

LTIFR1

            2.20

1.85*

3.07*

2.08

3.33

Accident Severity Index2

            136

112

149

598

1,058

Accidentability rate3   

            0.29

0.21

0.46

1.24

3.52

* Includes accidents and injuries reported by the Main Contractor and Subcontractors at the Inmaculada Project.
1 Calculated as total number of accidents per million labour hours.
2 Calculated as total number of days lost per million labour hours.
3 Calculated as LTIFR x accident severity divided by 1,000.

 

2016 Health Indicators

Indicator

              2016

2015

2014

2013

2012

Average number of medical attendances at Peruvian operations and at San José per month

             4,323

3,964

4,695

2,614

3,376

Average number of work-related incidents requiring medical attention at Peruvian operations and at San José per month

                21

22

23

14

18

Average number of occupational health examinations at the Group’s Peruvian operations

               367

283*

507

475

441

* The number of occupational health examinations decreased due to the conclusion of construction of the Inmaculada project

 

2016 People Indicators

Indicator

                2016

2015

2014

2013

2012

General

Average number of Group employees and contractors

               5,743

5,302

5,976

6,853

7,557

Training

Average number of hours of training undertaken per employee

during the year

               27.28

33.30

27.31

30.77

52.03

Percentage of workforce trained during the year

                89%

79%

61%

79%

90%

Labour relations

Number of production days lost as a result of industrial unrest

                31

17

14

 

16

7

 

2016 Community Relations Indicators

Indicator

               2016

2015

2014

Community investment1

              $4.4m

$3.0m

$6.7m

Production days lost as a result of community conflict

                 31

0

0

1 Total social expenditure by the Group. Figures prior to 2014 are not available.

 

2016 Environmental Indicators1

Indicator

                2016

2015

2014

 

2013

2012

Average monthly fresh water consumption per metric tonne of treated ore (cubic metres)

                 0.06

0.14

0.34

 

0.15

0.18

Electricity consumption per metric tonne of treated ore (Kw-h)

               105.79

91.02

98.95

82.75

 

88.69

Diesel consumption per metric tonne of treated ore (gallons)

                 1.61

1.73

1.23

 

1.18

1.53

Number of material environmental incidents across entire operations

                    2

0

0

0

0

Estimated volume of water withdrawn per day (cubic metres)

                5,279

14,330

29,716

15,538

 

15,925

Estimated proportion of recycled water used

                  72%

54%

36%

 

55%

60%

Estimated volume of water discharged per day (cubic metres)

              25,322

25,057

26,316

32,878

30,773

1 Includes data for the whole year for Arcata, Selene, Pallancata, Inmaculada and San José.